GPC is currently developing five projects (four in power and one in water) in partnership with strategic players within the framework of BOOT (build-own-operate-transfer) agreements.
ZESCO, a vertically integrated parastatal utility, operates government-owned power stations and is responsible for maintaining and installing transmission lines and distribution networks.
The Saudi Electricity Company has awarded contracts for 10 GWh of battery energy storage systems in several locations, while a 1. 3 GWh off-grid system at the Red Sea Project will support a luxury tourism site entirely with renewable energy.
In 2026, the installed cost of a 100kWh commercial lithium battery energy storage system typically falls within the following range: USD 180 – 380 per kWh (installed) Total system cost: USD 18,000 – 38,000In 2026, the installed cost of a 100kWh commercial lithium battery energy storage system typically falls within the following range: USD 180 – 380 per kWh (installed) Total system cost: USD 18,000 – 38,000.